🏗️ Tools & Templates

Operational systems from a real Queenslander build.

Not generic spreadsheets. Four systems built from the actual Coorparoo project records, packaged so you can run the same logic on your renovation. Plus three free calculators and subscriber downloads from the same source.

Slab and foundation works on the Coorparoo build, the kind of stage these tools help you scope

📊 Free planning tools

Calculators

Three free tools that turn the $331,510 Coorparoo build into an estimate for your project. Use them as a structural reference alongside your own current trade quotes.

This site is general information only. It is not building, legal, financial or certification advice. Read our full disclaimer →

Build-Under Budget Estimator

Scales the Coorparoo project ratios to your floor area and specification level.

Coorparoo project scaling tool

Coorparoo ratios scaled to your inputs.

The Coorparoo enclosed habitable build-under was 112.5 m²

Included

  • House raising (contractor + temporary works)
  • Structural engineering
  • Concrete slab
  • External and internal wall framing
  • Rough-in services (electrical and plumbing)
  • Windows and external doors
  • External cladding
  • Insulation and plasterboard
  • Bathroom and laundry fit-out
  • Flooring and painting
  • Permits, certifier and engineering fees

Not included

  • Upstairs renovation or extension
  • Kitchen (ground floor)
  • External landscaping, driveway, fencing
  • Structural issues with existing house
  • Asbestos removal
  • Site-specific conditions (access, soil, slope)
  • Builder's margin (if not owner-builder)
  • Contingency (budget 10-15% extra)

Owner-Builder Savings Calculator

Estimate what you could save going owner-builder vs a licensed fixed-price builder. Based on an estimated 33% saving by avoiding builder's margin. Results are indicative only.

Owner-Builder Savings Estimate

Based on industry margin assumptions: 15-20% midpoint.

If you don't have a builder quote, use the Build-Under Budget Estimator above first.

Your time

Managing an owner-builder project is at minimum a part-time job during active construction. During the raise, slab and frame stages it can be closer to full-time. The saving is real, but the time cost is too.

Risk and variation management

As the owner-builder, you wear the risk of variations, delays and defects. A licensed builder absorbs these risks (to the extent their contract allows). Budget a 10-15% contingency on top of any owner-builder estimate.

Personal legal responsibility

You are the nominated responsible person for compliance. If something is non-compliant, the responsibility sits with you: not a builder. This is a genuine trade-off, not just paperwork.

Resale restrictions

If you sell within six years of completing owner-builder work, you must provide the buyer with a building inspection report and may need warranty insurance. This can affect financing and sale negotiations.

Raise Readiness Score

A 10-question check on how ready your project, site and finances are for a Queenslander raise and build-under. Takes about two minutes.

01. Do you own the property (or are you under contract to purchase)?

Required for a QBCC owner-builder permit.

02. Do you intend to live in the property after the renovation?

Owner-builder permits require you to occupy the property as your principal place of residence.

03. Do you have a rough budget in mind of at least $200,000 for the project?

A full raise and build-under in Brisbane is typically $250,000-$400,000+.

04. Have you checked whether your property is in a character or heritage overlay?

Character overlays can restrict what changes you can make to a Queenslander.

05. Do you have at least 6-12 months available before you need to start on site?

Planning and approvals typically take 3-9 months before any site work begins.

06. Are you prepared to manage licensed trades directly (or have experience doing so)?

Owner-building requires coordinating multiple trades across many months.

07. Have you had an initial conversation with a structural engineer about the raise?

An engineer can tell you if a raise is feasible on your specific property.

08. Have you checked your council zoning and height-to-boundary rules?

Higher raises can affect setbacks and building envelope calculations.

09. Do you have access to contingency funds of at least 15% above your estimated budget?

Variations are common. A 15% contingency is the minimum for a project like this.

10. Have you read or researched what the owner-builder permit process involves in Queensland?

Understanding the permit requirements before starting is critical.

About these calculators

These calculators use the $331,510 Coorparoo build-under as a reference point. They produce rough estimates only: your actual costs will depend on your site, house size, specification choices, contractor pricing and market conditions at the time you build. Always get multiple quotes from licensed professionals before making financial decisions.

🏗️ The Toolkit

The toolkit: four systems from the Coorparoo records

Each system is a structured set of working files: spreadsheets, checklists, templates and methodology, drawn from the real $331,510 build and packaged so you can apply the same logic on your project.

Renovation Budget System

Cost framework with the real Coorparoo line items pre-loaded.

$79

Project Control System

The full owner-builder admin kit: inspections, contracts, trackers.

$149

Renovation Readiness Framework

Decision questions and pre-lodgement structure before you start.

$99

Owner-Builder Templates

QBCC course prep, council DA support and the paperwork bundle.

$49
The completed Coorparoo Queenslander
The completed project these tools came from.

Free for subscribers

Skip the estimate — get the actual line items

The Coorparoo $331,510 line items as a read-only XLSX, plus the 8-stage owner-builder inspection checklist (PDF). Both free for subscribers.

  • All 8 cost categories with individual line items
  • 8-stage inspection checklist PDF
  • Read-only reference: pair with your own current quotes
Get the free downloads

Free. Unsubscribe any time. No third parties.

See the full toolkit →

Or skip the free files

The full operational kit: $49 - $149

The Budget Toolkit, Control Pack, Readiness Pack and QBCC Course Prep give you the working files. Spreadsheets, checklists and contracts drawn from the same $331,510 build.

See the paid templates